Geotechnical Society of Edmonton
4th Annual GSE (& NASTT) Symposium (April 08, 1999)
Advancements In Trenchless Technology
Speakers Presentations
R. Clementino, P. Robertson, K. Biggar & G. Cyre A New Horizontal Logging Tool for Geotechnical and Geoenvironmental Applications
P. Rasmussen Advancements in Microtunneling
Mark Brand Relining of Pressure Piping Systems: Expanding the Envelope
N. Koirala & T. Jervis Pipe Jacking under a Freeway
M. A. Polak, M. Gelinas, R. McKim & M. Knight Analysis of Strain Data from Field Tests on HDPE Pipes Installed Using Horizontal Directional Drilling
A. Miller City of Edmonton Supernatant Pipeline/Celanese Service Connection River Crossing by HDD Methods
A. Branham A Contracting History of Auger Boring in Alberta
L. Thomas A Case History of a Directionally Drilled Crossing of the South Heart River
P. Strychowskyj Lessons Learned in Trenchless Pipe Replacement
J. Leszkowicz Ge-environmental Horizontal Drilling at Consort Health Centre
C. Como Installation of Gravity Sewers using Horizontal Directional Drilling
B. Oliver Innovations in Drilling Muds for Trenchless Applications
Ken Skaftfeld, UMA Engineering Ltd. Abandoned Clinton Creek Asbestos Mine

CONTACT

c/o. City of Edmonton
Engineering Services
11004 - 190 Street NW
Edmonton, Alberta
CANADA T5S 0G9
Fax: (780) 944-7653
Email GSE
Email Web Admin
Registration Form